Search Results: 'McConnell Dowell'

You searched for McConnell Dowell

Current Refinements
McConnell Dowell
  Date 2018
Remove all refinements
Refine Search Content Type Features (1) News (1)

Breakthrough at Whangaparaoa
07 September, 2018
New Zealand – The sea outfall project at Whangaparaoa broke through on 2 August after four months of excavation. The 1,930m-long drive was undertaken by McConnell Dowell using a Herrenknecht AVN 1000DP with an excavation diameter of 1,220mm. The drive is the longest yet for the German manufacturer’s Direct Pipe system.

Changing safety culture
29 August, 2018
Leah Jacobs looks at her own contribution to the Waterview Connection project in New Zealand