Search Results: 'Costain'

You searched for Costain

Current Refinements
Costain
  Content Type Features
  Date 2020
Remove all refinements
Refine Search

Connecting HS2 at Euston
22 September, 2020
Work on the UK’s new HS2 high-speed rail line is on track. Emma Hale and Christoph Eberle of Mott MacDonald describe one of the line’s first underground structures to be built in London

Muck disposal on a grand scale
25 August, 2020
Tideway (the so-called ‘super sewer’) is the biggest water infrastructure project in Europe and aims to rid the River Thames of millions of tonnes of raw sewage inflows every year. Julian Champkin reports on the progress so far

Finally back on track
11 June, 2020
HS2 has at last been given the green light, following the notice to proceed which is enabling four joint ventures to finalise their designs. Julian Champkin reports

The Avon House Case
19 May, 2020
Paola De Pascali talked with Paul Perry, associate director of Hewson consulting Engineers, about the infamous case of Avon House at the Bond Street Station Upgrade (BSSU) project and how it represents an example of sensitive building, which required a detailed investigation and mitigation measures

Lifting from below
27 April, 2020
While the use of cranes underground may be limited, when they are used, specific adaptations are often required. Ian Vallely spoke to tunnelling experts about their requirements, and crane companies who’ve met these demands