Search Results: 'CFE'

You searched for CFE

Current Refinements
CFE
  Date 2013
Remove all refinements
Refine Search Content Type Features (1)

Extreme Immersion Design
04 December, 2013
The Second Coen Tunnel must survive severe loadings during the usage phase: 16m of water in the middle of the North Sea Canal and 8m of soil at the banks. The determining design scenarios were the sea transport of two days and possible impact by a sunken ship. This article goes into the general immersed tube principle and the construction and transport phases. The usage phase will be covered in the next article, to be published in an upcoming issue of Tunnels