Search Results: 'Southern Water'

You searched for Southern Water

Current Refinements
Southern Water
  Date 2008
Remove all refinements
Refine Search Content Type Features (6) News (8)

Vietnamese official suspended over Japanese bribe allegations
24 November, 2008

Hindhead hit
27 October, 2008
The A3 Hindhead twin bore tunnels, under construction in England, are taking forward the development of permanent SCL. Report and photos by contributing editor Patrick Reynolds

Upper Rouge CSO cleared
27 October, 2008

Hope for Brighton sewer
27 October, 2008

Easing Manhattan’s friction
26 September, 2008
The complex subsurface interchanges of lower Manhattan’s Subway lines are currently being restructured to remove a tangled legacy of “friction”. At the centre of this scheme is the new Fulton Street Transit Center. Technical journalist Adrian Greeman reports

Topping up the work at Lake Mead
23 September, 2008

Mexican boom gains momentum
23 September, 2008

Arrowhead triumph for JV
23 September, 2008

Bright future for Australasia
23 September, 2008
ATS journal editor, David Lees, gives an overview of the booming tunnelling workload mooted for Australasia in the coming years

The Arrowhead Tunnels project
13 August, 2008
Following the British Tunnelling Society’s Annual General Meeting, Brian Fulcher, project director for Shea-Kenny Joint Venture, and Mike Bell, resident engineer for Hatch Mott MacDonald, described overcoming difficult ground conditions and water pressures with two hybrid hard rock TBMs for the Arrowhead Tunnels in Southern California, US

Driving Kowloon’s Southern Link
29 April, 2008
David Hake, TBM tunnel manager, for Link 200 JV describes the challenges encountered during the twin, stacked, slurry TBM drives for the Kowloon Southern Link project, in Hong Kong

Sprayed concrete success
29 April, 2008
Tunnel support and lining methods involving sprayed concrete have had more than their share of controversy. Technical journalist, Maurice Jones, looks at this maturing technology with practitioners and suppliers

Lake Mead No 3 Intake award due
29 April, 2008

Glendoe TBM holes through
22 January, 2008