Search Results: 'Skanska'

You searched for Skanska

Current Refinements
Skanska
  Date 2019
Remove all refinements
Refine Search Content Type Blogs (1) Features (5) News (6)

Momentum
23 December, 2019
The City of Los Angeles has seen several milestones this summer for its Purple Line extension, Nicole Robinson reports on the progress for each phase

Crossrail issues Bond Street air quality update
24 October, 2019
Great Britain – Crossrail and contractor Costain Skanska JV ordered an independent air quality survey at the Bond Street project, following concerns about two (off-site) worker fatalities.

Stakeholders reject working conditions as cause of Bond Street deaths
10 October, 2019
Great Britain – Two workers on Crossrail’s Bond Street project passed away in their sleep in the same week. Various media have reported that working conditions relating to air quality or stress were to blame, but this has been rejected by stakeholders. Reports of further investigation, or further details of the illness were not forthcoming from the contractor or client.

Humber estuary tunnel breaks through
01 October, 2019
Great Britain – The Humber tunnel has broken through. The drive was completed by a joint venture of Skanska, Porr and A. Hak is utilising a VMT-guided, 4.4m-diameter Herrenknecht machine.

Momentum
27 September, 2019
The City of Los Angeles has seen several milestones this summer for its Purple Line extension, Nicole Robinson reports on the progress for each phase

Northern exposure
27 September, 2019
A round-up of tunnel work in the Nordic Forum

Chelsea to Battersea tunnel surface settlements
16 August, 2019
Monitoring of ground surface movements induced by the construction of the Chelsea to Battersea Pipeline Tunnel project is presented as part of this case study. The surface settlements induced by the shaft construction have been analysed and compared with current methodologies and information from recent projects. Movements from excavation and construction of the tunnel are also analysed, and back-analysis of volume losses is presented. The authors are Veriuska Ortiz Lovera, geotechnical engineer, Mott MacDonald; Andrew Hejdner, project manager, Cadent Gas; James McCaffrey, construction manager, Skanska UK Construction; and Mohammad Arasteh, senior tunnel engineer, Mott MacDonald

Planning for the twenties
14 August, 2019
In this issue of Tunnels and Tunnelling International Paola De Pascali reports from the World Tunnel Congress, which was held in Naples in May and saw a number of publications from working groups and committees. The ITA Committee for Technology (ITAtech was particularly prolific.

Crossrail outlines plan to complete Elizabeth Line
26 April, 2019
Great Britain – Crossrail has released an action plan to bring the project to a conclusion. The project has encountered delays and overspend in its final stages. The project will not be fully complete until 2021.

Helsinki spreads west
12 April, 2019
Paola De Pascali talked with Salminen Jukka principal designer of rock engineering at Pöyry’s to understand how the Western Metro is being extended from Matinkylä to Kivenlahti

HS2 signs Euston construction partner contract
19 March, 2019
Great Britain – Mace/Dragados will deliver the High Speed 2 (HS2) terminus at London Euston. It will act as a construction partner, working with HS2 and the station designers, to coordinate the building of the new station, including platforms, concourse and links to London Underground and other rail services.

MTA awards contract for an East Access tunnel
18 January, 2019
US – Skanska USA announced January 10 it has signed a contract with the Metropolitan Transportation Authority (MTA) to work on East Side Access.