Search Results: 'Mott MacDonald'

You searched for Mott MacDonald

Current Refinements
Mott MacDonald
  Content Type Features
  Date 2020
Remove all refinements
Refine Search

Up the junction, round the bend
23 October, 2020
While pushing a preformed portal box through an excavation has been done before, a Network Rail project demands that it be done on a curve – and that hugely increases the complexity. Julian Champkin reports

Connecting HS2 at Euston
22 September, 2020
Work on the UK’s new HS2 high-speed rail line is on track. Emma Hale and Christoph Eberle of Mott MacDonald describe one of the line’s first underground structures to be built in London

Guidance on writing a GBR
25 August, 2020
New guidelines being drawn up by CIRIA aim to show how geotechnical baseline reports can help manage geological and geotechnical risk, and reduce costs. George Demetri explains

Fire performance of concrete tunnel linings
25 August, 2020
Fire testing of concrete tunnel linings and the effects of explosive spalling were the subject of the British Tunnelling Society talk in March. Rosa Diez of Mott MacDonald reports

Hammersmith connection Tunnel
27 March, 2020
The September BTS meeting saw a presentation on the Thames Tideway project’s Hammersmith Connection Tunnel. The talk was presented by Peter Coppenhall of Morgan Sindall, working as the designer’s representative in Thames Tideway West, and Ed Batty of BAM Nuttall, currently working as a Tunnel Manager in the Frogmore Connection Tunnel. This report was prepared for Tunnels and Tunnelling by Rosa Diez, project director for Mott MacDonald

Under the Swan River
27 March, 2020
Alex Conacher travels to the Forrestfield-Airport Link in Perth, Western Australia to speak with Salini Impregilo, NRW project director Richard Graham and tunnel construction manager Carlos Zapico