Search Results: 'Mott MacDonald'

You searched for Mott MacDonald

Current Refinements
Mott MacDonald
  Content Type Features
  Date 2019
Remove all refinements
Refine Search

Chelsea to Battersea tunnel surface settlements
16 August, 2019
Monitoring of ground surface movements induced by the construction of the Chelsea to Battersea Pipeline Tunnel project is presented as part of this case study. The surface settlements induced by the shaft construction have been analysed and compared with current methodologies and information from recent projects. Movements from excavation and construction of the tunnel are also analysed, and back-analysis of volume losses is presented. The authors are Veriuska Ortiz Lovera, geotechnical engineer, Mott MacDonald; Andrew Hejdner, project manager, Cadent Gas; James McCaffrey, construction manager, Skanska UK Construction; and Mohammad Arasteh, senior tunnel engineer, Mott MacDonald

A digital twin
08 July, 2019
Digitalisation offers a variety of new possibilities. One of them is the modelling of infrastructure with Building Information Modelling (BIM). Digital technology is a core element for the simplification of processes and for automation. This also applies to already-built infrastructure, as the RetroBIM project launched by Amberg demonstrates. Pedro Luis Iserte Llacer, head of BIM at Amberg and Roger Schaad, marketing specialist at Amberg discuss the project

Deepest and Longest
07 May, 2019
Yves Boissonnas, head of tunnelling at Sika Europe Management, the guest speaker at the January BTS lecture, provided a presentation on the Gotthard Base Tunnel