Search Results: 'Morgan'

You searched for Morgan

Kate Cooksey Interview
30 August, 2022
Kate Cooksey has completed one of the most unusual and challenges periods for any chair of the BTS. With much success achieved despite the trying times, she talks about the journey with Julian Champkin

Steps forward in SCL sustainable tunnels
30 August, 2022
Ross Dimmock, vice president for tunnelling at Normet, gave an online talk for the BTS lecture in January to discuss the advancing performance of sprayed concrete lining (SCL) technology in underground construction, including progress to support sustainability

Harding prize yields another worthy winner
24 June, 2022
Chris Barrett, a young civil engineer working with BAM Nuttall on Tideway’s Western Section C405 has won the British Tunnelling Society’s Harding Prize 2022 for his paper ‘The Planning and Construction of Main Line Tunnel B Connection Tunnel’ It is reproduced below by kind permission of the author

Notes on compressed air working – Part 1
17 March, 2022
In this two-part article, Stephen Doran first discusses the history of compressed air work in tunnelling and then looks into those projects where the technique has proved problematic

Tunnelling the Thames
29 October, 2021
Sagar Sheth, Principal Tunnelling Engineer, and Richard Miller, Head of Tunnelling, both of Ramboll UK, describe the design checks and assurance services, risk and stakeholder management they provided during the construction of Tideway

Closed form tunnel analysis methods
07 September, 2021
In the first of a series of articles, Stephen Doran looks at closed-form tunnel analysis methods, their background and how they can provide an insight into the underlying assumptions used in software

Defying the quakes
17 June, 2021
Reconstructing an existing dam and building new intakes, outtakes and spillway form part of an ambitious 10-year programme in the drought-hit and earthquake-prone Santa Clara Valley, California. George Demetri reports

Lord of the rings
25 February, 2021
A new ring-build system is said to offer health and safety gains, but also cuts ring completion times by around a third - bringing significant cost savings. George Demetri reports

Up the junction, round the bend
23 October, 2020
While pushing a preformed portal box through an excavation has been done before, a Network Rail project demands that it be done on a curve – and that hugely increases the complexity. Julian Champkin reports

Muck disposal on a grand scale
25 August, 2020
Tideway (the so-called ‘super sewer’) is the biggest water infrastructure project in Europe and aims to rid the River Thames of millions of tonnes of raw sewage inflows every year. Julian Champkin reports on the progress so far

A good dose of fibre
11 June, 2020
Steel fibre-reinforced concrete and its historic use in metro tunnels was the subject of discussion at a seminar hosted by steel-fibre maker Bekaert. Paola De Pascali reports

Banging the drum
10 June, 2020
Kate Cooksey has just assumed the chair of the British Tunnelling Society, as only the first female ever to do so. Here she talks to George Demetri about her career and aspirations for the BTS

Hand arm vibration
27 April, 2020
Construction puts wellness and the protection of the workforce right at the top of the agenda. Why is no progress being made on the UK’s highest reported workplace disease: hand arm vibration syndrome? This report was prepared by Reactec, which develops systems to measure the problem.

Lifting from below
27 April, 2020
While the use of cranes underground may be limited, when they are used, specific adaptations are often required. Ian Vallely spoke to tunnelling experts about their requirements, and crane companies who’ve met these demands

Hammersmith connection Tunnel
27 March, 2020
The September BTS meeting saw a presentation on the Thames Tideway project’s Hammersmith Connection Tunnel. The talk was presented by Peter Coppenhall of Morgan Sindall, working as the designer’s representative in Thames Tideway West, and Ed Batty of BAM Nuttall, currently working as a Tunnel Manager in the Frogmore Connection Tunnel. This report was prepared for Tunnels and Tunnelling by Rosa Diez, project director for Mott MacDonald

Augmented underground
23 December, 2019
Phil Evans, a section planner, Jose Goncalves, a tunnel sub-agent and Sean Melody, works superintendent explains how digital transformation can reshape tunnelling, showing the latest digital technologies being used by the Morgan Sindall, BAM Nuttall, Balfour Beatty joint venture delivering the west section of the Thames Tideway Tunnel

TAC Directors’ Annual Reports
26 October, 2018
Each regional director for the TAC writes a report in October sharing the status of work and forthcoming projects in the five chapters across Canada

Keep moving
05 September, 2018
Nicole Robison and Paola De Pascali look at innovative ways to bring equipment and materials from the factory floor to the bottom of the tunnel shaft

Carnwath road
26 July, 2018
Paola De Pascali met Ben Green, delivery manager for the West section of the Thames Tideway Tunnel and Ivor Thomas, tunnel manager for the joint venture of Bam Nuttall, Morgan Sindall and Balfour Beatty, which is coming to terms with the challenges of working in confined spaces at the Carnwath Road site for the Tideway project

In Practice
29 August, 2017
Over the past two decades major advancements have been developed to improve the mechanical performance, ease of application and durability of shotcrete materials. Nicolas Ginouse, William Clements and Scott Rand of King Packaged Materials Company present an overview of current state-of-theart practices and latest technology available to the tunnelling industry.