Search Results: 'Deutsche Bahn'

You searched for Deutsche Bahn

Current Refinements
Deutsche Bahn
  Date 2018
Remove all refinements
Refine Search Content Type Features (1) News (1)

Filder Tunnel western breakthrough
23 August, 2018
Germany – The TBM boring the western tube of the 9.5km twin tube Filder Tunnel broke through in late July. As Tunnels and Tunnelling goes to press, the 120m-long, 10.82m-diameter Herrenknecht multi-mode machine is being disassembled and turned around inside a 120m-long cavern. In autumn it will bore a 3.4km section of the eastern tube to complete the tunnel.

Deutsche dip
19 June, 2018
Alex Conacher speaks to Stuva’s managing director Roland Leucker about the current challenges facing metro work in Europe’s largest economy