Search Results: 'Atkins'

You searched for Atkins

Current Refinements
Atkins
  Date 2016
Remove all refinements
Refine Search Content Type Features (3) News (4)

Nordic Neighbors
03 November, 2016
The ITA’s Nordic Forum provides an opportunity for canada and other nations to exchange information. Tunnels & Tunnelling looks at projects underway in the region

Achievements and Aspirations
08 June, 2016
Last month saw a changing of the guard at the BTS, with Roger Bridge handing the Chairman’s baton over to Mark Leggett. They spoke to Sally Spencer about achievements thus far and plans for the future

Britain launches segmental lining code of practice
20 April, 2016
GREAT BRITAIN – A specification for the design of concrete segmental linings was launched in mid-April. The document, “Publicly Available Specification (PAS) 8810:2016 – Tunnel Design: Design of concrete segmental linings: Code of practice” was produced by the British Standards Institute (BSI) and lead technical author Arup.

HS2 Phase One Delivery Partner confirmed
28 March, 2016
GREAT BRITAIN – High Speed Two (HS2) confirmed the delivery partner for its first phase between London and Birmingham. The rail link will be delivered by a joint venture of CH2M, Atkins and Sener.

Meeting the challenge
14 March, 2016
A small engineering company in Essex is making a big contribution to Europe’s largest infrastructure project, Crossrail. Sally Spencer Reports.

Stonehenge design consultancy awarded
27 January, 2016
GREAT BRITAIN – An Arup Atkins JV has been appointed as the design consultant for the Stonehenge Tunnel project. The project is part of the A303 Amesbury to Berwick Down Improvement Scheme, which also includes a bypass of nearby village Winterbourne Stoke.

Arup-Atkins win Thames Tideway West consultancy
08 January, 2016
GREAT BRITAIN – Atkins and Arup will provide design and engineering services on the west section of the Thames Tideway project. The contractors for this section, BAM Nuttall, Morgan Sindall and Balfour Beatty, will tunnel 6km of 7.2m-diameter tunnel from the Acton Storm Tanks at the extreme west of the scheme, to the start of the central section at Carnwath Road.