Search Results: 'London Bridge Associates'

You searched for London Bridge Associates

Current Refinements
London Bridge Associates
  Date 2008
Remove all refinements
Refine Search Content Type Features (2)

The Arrowhead Tunnels project
13 August, 2008
Following the British Tunnelling Society’s Annual General Meeting, Brian Fulcher, project director for Shea-Kenny Joint Venture, and Mike Bell, resident engineer for Hatch Mott MacDonald, described overcoming difficult ground conditions and water pressures with two hybrid hard rock TBMs for the Arrowhead Tunnels in Southern California, US

Drill and blast in confined spaces
29 April, 2008
At the joint meeting of the BTS and MinSouth on 21 February 2008, Richard Soloman, project manager for WECS, Damian McGirr, of Donaldson Associates, and Mark Thomas, site manager for WECS, described the drill and blast works on an urban flood alleviation tunnel in Bristol, UK