Search Results: 'Herrenknecht'

You searched for Herrenknecht

Strabag breaks world record for longest single bored tunnel
08 December, 2023
Strabag UK has completed 25.8km of the tunnel at the Woodsmith project near Whitby, in north-east England, setting a new world record for the longest single TBM drive.

HS2 tunnel blessed on World Tunnelling Day
05 December, 2023
HS2 marked World Tunnelling Day yesterday with a blessing on the site of the next set of tunnels to be bored by two TBMs under London.

Herrenknecht strengthens deep drilling business
28 November, 2023
Herrenknecht has strengthened its portfolio of automated drilling rigs and equipment by acquiring a majority stake in H Anger’s Söhne Bohr- und Brunnenbaugesellschaft.

Ground conditioning over the decades
27 November, 2023
Lars Langmaack, Technical Director (TBM) of MC-Bauchemie Müller GmbH’s tunnelling business unit, gives a personal review of EPB tunnelling development, including the development of soil conditioning additives in recent decades, and ways ahead

Giving slurry treatment plants a new life cycle
27 November, 2023
To support improving economic and sustainability outcomes on slurry shield tunnelling projects, the benefits to be gained from refurbishment of slurry treatment plant are discussed by Gino Vogt, Head of Herrenknecht Separations

Half of HS2 Chiltern Tunnel cross-passage mining complete
23 November, 2023
Mining has been completed on half of the cross-passages for HS2’s longest tunnels.

TBM component lifts completed in London
21 November, 2023
HS2 has completed a set of major lifts of TBM components at its Victoria Road Crossover Box site, in Ealing, west London.

West Gate Tunnel TBMs dismantled
13 November, 2023
The two TBMs that built Melbourne’s twin West Gate Tunnels have been dismantled and all of the underground roadway installed.

VTA purchases TBM for BART Silicon Valley Phase II
08 November, 2023
The Santa Clara Valley Transportation Authority (VTA) has ordered the TBM for the BART Silicon Valley Phase II Project (BSVII).

Second TBM arrives at Vancouver’s Oak-VGH Station
31 October, 2023
The second TBM has broken through at the future Oak-VGH Station on Vancouver’s Broadway Subway Project.

Names of HS2’s latest TBMs revealed
24 October, 2023
The major components of the first of the next two TBMs to be launched for HS2’s London tunnels have been lifted into the ancillary shaft

Lyon-Turin line progresses on 11 fronts
18 October, 2023
Another TBM to be used on the Mount Cenis base tunnel has passed its Factory Acceptance Test.

Vancouver subway marks another breakthrough
16 October, 2023
The first of two TBMs has broken through at the future Oak-VGH Station on Vancouver’s Broadway Subway Project.

TAC Awards recognise industry achievements
12 October, 2023
Professor KY Lo, a former director of the Geotechnical Research Centre for the Department of Civil and Environmental Engineering at Western University in Ontario, has received a Lifetime Achievement Award from the Tunnelling Association of Canada (TAC).

Tunnelling progresses on Oslo water project
13 September, 2023
A TBM that will drill one of the tunnels for the Oslo New Water Supply Project has arrived in the Norwegian capital.

Australia’s first autonomous TBM launched
06 September, 2023
Australia’s first autonomous TBM has been launched on Sydney Metro West.

Tunnelling reaches halfway mark on Auckland water project
04 September, 2023
Tunnelling on Watercare’s Central Interceptor project in New Zealand has reached the halfway mark.

Boring for Silvertown
25 August, 2023
Silvertown road tunnel project features a huge, single TBM – and a U-turn for the machine – to complete the twin tube under the Thames, in London

Melbourne prepares for TBM arrival
22 August, 2023
The ship carrying the first of two TBMs that will dig the North East Link Tunnels is due to arrive in Melbourne soon.

HS2 opens TBM naming competition
21 August, 2023
HS2 is asking the public to choose names for the next two TBMs that will dig high-speed rail tunnels under London.