Search Results: 'Parsons Brinckerhoff'

You searched for Parsons Brinckerhoff

Current Refinements
Parsons Brinckerhoff
  Date 2015
Remove all refinements
Refine Search Content Type Features (2) News (6)

International Tunnelling Association Awards
02 December, 2015
INTERNATIONAL - The ITA awarded its inaugural Tunnelling Awards on November 19, in Hagerbach Switzerland.

Mouchel appoints new director
27 November, 2015
GREAT BRITAIN – Mouchel has appointed Richard Crossley as its senior technical director for transport planning. Crossley joins from WSP Parsons Brinckerhoff where he led transportation planning services in the Middle East. Crossley brings with him over 40 years of experience within the transportation consultancy sector, including six years with the Department of Transport.

Walsh’s Archer Western leads Atlanta upgrade contract
12 November, 2015
USA -The Metropolitan Atlanta Regional Transit Authority (MARTA) recently signed a USD 198.5M contract to overhaul and upgrade its tunnel ventilation system (TVS), it announced on November 10.

Waterview Connection breakthrough
23 October, 2015
NEW ZEALAND – The TBM broke through on the second drive of Auckland’s Waterview Connection project last month. Billed by contractor McConnell Dowell as one of the largest TBMs ever used in the southern hemisphere, Alice, the 14.4m-diameter Herrenknecht EPBM completed its 2.4km-long journey.

Tunnelling VPs appointed at WSP PB
29 September, 2015
CALIFORNIA – WSP Parsons Brinckerhoff has named Steve Klein and Steve Dubnewych vice presidents of the firm’s tunnelling practice in California, it was announced September 22.

Rapid response
13 August, 2015
Ground freezing in Washington, D.C., will reduce the effects of construction on a quiet neighborhood prone to flooding. Nicole Robinson reports on the First Street Tunnel.

Float on
24 June, 2015
The JV constructing the new Midtown Tunnel has floated and immersed more than half the elements in the Elizabeth River, bringing each one more than 200 miles through the Chesapeake Bay, Nicole Robinson reports.

Alice takes a breather
27 February, 2015
NEW ZEALAND – The backup train of the Waterview Connection TBM was in the process of being turned to join up with the cutterhead and shield already working on its second bore path as Tunnels and Tunnelling went to press.