Feasibility award for trans-Andean project

14 July 2017


Peru - A feasibility study for a link between Huancayo and Lima has been awarded to a joint venture of Dohwa Engineering, Geodata and Italferr.

The study length is two years. The project will consist of three tunnels: a main 25km drive, a 13km and a 5km. The project will cost approximately USD 2bn.